Everything between topping out and handover.

The work that has to be done before a building can be handed to anybody: interim budgets that survive their first year, insurance placed properly, accounting and portals live before closing, and a document package that does not generate three hundred phone calls.

For developers approaching completion

Handover is a project, and it starts about nine months out.

By the time an occupancy permit is issued, a long list of things should already exist: a defensible interim budget, insurance on the completed building, a bank account and accounting structure, a configured owner portal, a document package for closing, and a manager who already knows the building. Assembling those in the last fortnight is how handovers go badly.

Klein is engaged on most projects six to nine months before occupancy. That is not us padding a scope — it is the point at which budget comparables, insurance appraisal and document preparation genuinely need to begin if they are going to be ready.

At a glance

Typical engagement6–9 months before occupancy
Project typesStrata condominium, purpose-built rental, mixed-use
DeliverablesInterim budget, insurance, accounting set-up, portal, document package
Continues intoStrata turnover, or rental lease-up and operations

The interim budget

The number owners will judge you on for two years.

A first-year budget that is too low is not a favour to anybody. It makes the sales pro forma look good and then produces a fee increase in year two, an angry first AGM and a reputation that follows the next project. We build interim budgets from comparables in buildings of similar age, size and amenity — and we will tell you when a number is optimistic.

  • Interim operating budget built from real comparable buildings
  • Amenity operating cost modelled rather than estimated
  • Contingency reserve fund contribution set against the Act’s requirements
  • Strata fee schedule by unit entitlement
  • Written rationale for each line, so it can be defended at the first AGM
  • Honest flagging of any line the sales material has understated

Appraisal, insurance and the things that bite

Placed on the finished building, not the construction site.

Course-of-construction cover ends; the building needs its own policy, placed on a current appraisal, before anyone takes possession. BC strata insurance has been a difficult market for several years and deductibles on water damage in particular need to be understood by the first council rather than discovered by them.

  • Full replacement cost appraisal commissioned
  • Policy placed through volume relationships rather than a single broker quote
  • Deductible structure explained in writing to the first council
  • Certificates issued for closings and lender requirements
  • Course-of-construction to operational policy transition managed
  • Bare land and phased development structures handled where they apply

Accounting, banking and the portal

Live before the first closing, not after.

The corporation needs a bank account, a chart of accounts, a collection mechanism and a portal that works on the day the first owner moves in. Set up afterwards, the first two months of records are reconstructed rather than recorded, and it shows at the first audit.

  • Bank accounts opened with correct signing authority
  • Chart of accounts configured to the corporation’s structure
  • Pre-authorised debit set up for strata fees or rent
  • Owner and resident portal configured and tested before closings
  • Opening balance sheet and developer contribution recorded
  • Form B and Form F production ready from day one

The document package

What the owner actually receives at closing.

Every purchaser receives a package. Done well, it answers the questions they would otherwise ring you about: who manages the building, how to pay, what the bylaws say, how to book the elevator, what the warranty covers and who to call at midnight.

  • Welcome package drafted, designed and produced
  • Bylaws and rules issued in readable form, not just filed
  • Move-in procedures, elevator booking and parking allocation
  • Warranty summary and how to make a claim
  • Portal credentials and payment instructions
  • Distribution handled by Klein or the developer

Service Scope

The full developer services scope.

Engaged as a package or individually. Strata turnover and rental lease-up are separate engagements that follow on.
Budget & financial set-up
  • Interim operating budget
  • Comparable building analysis
  • Amenity cost modelling
  • CRF contribution setting
  • Strata fee schedule by entitlement
  • Bank account opening
  • Chart of accounts
  • Pre-authorised debit set-up
  • Opening balance sheet
Insurance & risk
  • Replacement cost appraisal
  • Policy placement
  • Deductible structure briefing
  • Certificates for closing and lenders
  • Course-of-construction transition
  • Phased and bare land structures
Systems & documents
  • Owner portal configuration
  • Resident portal and work orders
  • Welcome and closing package
  • Bylaws and rules production
  • Move-in procedures
  • Warranty summary
  • Form B and Form F readiness
Handover co-ordination
  • Trade and consultant contact list
  • O&M manual collection and indexing
  • As-built drawing collection
  • Commissioning record collection
  • Key, fob and access system handover
  • Service contract novation or re-tendering

Timeline

When each piece has to happen.

Counting backwards from the occupancy permit.

01

9–6 months out

Engagement, comparable analysis and the first draft of the interim budget. Appraisal commissioned. This is also when we flag anything in the sales material that the operating numbers will not support.

02

6–3 months out

Insurance placed. Bank accounts and accounting structure established. Portal configured. Document package drafted and sent for your review.

03

3 months to occupancy

Service contracts tendered or novated. O&M manuals, as-builts and commissioning records collected. Keys, fobs and access systems handed over. Welcome packages produced.

04

Occupancy onward

Closings begin, portal goes live, first fees or rents collected. The engagement continues into strata turnover or into rental lease-up, depending on the project.

Questions

What developers ask us first.

How early should we engage you?

Six to nine months before occupancy for a strata project. Earlier if the building has unusual amenity, a phased structure or an air space parcel, because the budget and insurance work takes longer in all three cases. Rental projects can start later on the operations side but need to start earlier on marketing — see lease-up.

Can we use our own interim budget?

Yes, and we will review it and tell you honestly what we think. Where we disagree we will say so in writing, with the comparables behind our view. What we will not do is sign off a budget we think is indefensible, because we are the ones who have to explain it at the first AGM.

What does this cost?

Normally a fixed fee for the handover scope rather than a percentage, scaled to unit count and complexity, plus third-party costs such as the appraisal at cost. Quoted per project. The ongoing management agreement is priced separately and does not depend on using us for handover.

Do we have to use you for ongoing management too?

No. Developer services can be a standalone engagement, and some developers use us for handover and run a competitive process for ongoing management afterwards. We would rather win that on merit. In practice most projects continue with us, because by occupancy we know the building better than anyone bidding cold.

What about a phased development or an air space parcel?

Both are handled, and both need the budget and governance work started earlier. Phased developments bring disclosure obligations and the question of how shared facilities are funded across phases; air space parcels bring a reciprocal easement agreement that governs cost sharing and usually needs careful reading before any budget is built on it.

Our project is purpose-built rental, not strata. Is this still relevant?

Most of it, minus the strata governance. You still need a defensible operating budget, insurance on the completed building, accounting and portals live, and the handover documentation collected. What replaces the strata work is lease-up.

Related reading

For developers

  • Why an optimistic interim budget costs more than an honest one
  • BC strata insurance: what to tell your first council
  • What belongs in a closing package

What owners say

Developers, in their own words.

★★★★★

“Shawn Lu has truly been an amazing property manager. As a tenant, I've received tremendous support ensuring our move-in was smooth and that the property is managed and maintained efficiently. Shawn has gone above and beyond — truly the best out there.”

Zach pereira
Mount Pleasant, Vancouver
★★★★★

“Josh helps me manage my rental properties and is reliable and responsive. He’s been great at finding good tenants and the ongoing management, making my life a lot easier while I’m overseas.”

Jeremy wong
Mount Pleasant, Vancouver
★★★★★

“Josh knows his business inside and out. He has been my property manager for several years. He is always quick to respond, provides solutions and accurate and timely reporting. His tenant searches are thorough and placements have been highly successful. I highly recommend his service, you are getting one of the best in the industry and you won’t regret it.”

Christy Aylen Curtis
Mount Pleasant, Vancouver

Request a proposal

Bringing a project to completion?

Tell us the address, the unit count and the occupancy date. We will come back with a scope and a fee for the handover work.